
25 Oct
2006
25 Oct
'06
6:46 p.m.
hi, i'm thinking about adding a version check when connecting to a swank server to ensure that slime.el and swank.lisp are in-synch. this would remove the, admitedly rare, errors whan the two are out of synch (this can happen when running a local slime against a remote lisp or when swank has be built into the image and isn't reloaded each time the lisp is started). however this would require that everytime a change is commited people must remeber to update the version number. is this worth the overhead? -- -Marco Ring the bells that still can ring. Forget your perfect offering. There is a crack in everything. That's how the light gets in. -Leonard Cohen